
The Electricity Authority (EAC) on Thursday hit back at reports that it’s blocking the operation of a key infrastructure of a private power station located near its own Vasiliko plant, insisting that the rival facility lacks the necessary permits.
In a press release, the EAC was answering reports in the press this week, to the effect that it’s hampering the coming online of the private power station belonging to PEC






